View Issue Details

IDProjectCategoryView StatusLast Update
0000834T99X171.00 SKB EagleGeneralpublic2023-02-23 10:18
Reporter(ALTech) SH Son Assigned To(PM) Henry ChiouDue Date2020-06-26 11:25
PriorityhighSeveritys2-severeReproducibilityrandom
Status closedResolutionfixed 
Summary0000834: [BFX-AT100] 2020 May Mass production inspection Report
DescriptionBFX-AT100 Inspection report 2020. 05.

Please refer to the attachment file.
TagsNo tags attached.
Attach Tags

Relationships

related to 0001662 new [Eagle] Mass production inspection Report 

Users monitoring this issue

User List (ALTech) BY Lee , (ALTech) JW Kim , (ALTech) SB Park , (ALTech) SH Son , (ALTech) SY Yoon , (PM) Henry Chiou , (PM) Tiffanie Lai

Activities

(ALTech) SH Son

2020-06-05 16:34

developer   ~0003653

here is inspection report

(PM) Henry Chiou

2020-06-24 09:23

developer   ~0003700

Hi SH,

Here is the analysis report for your information.
For the last 2 items, after we did the preliminary analysis we decided to return the defects to vendors for further analysis.
We will update again later.

(ALTech) SH Son

2020-06-29 16:47

developer   ~0003709

(History record. Same as email)

Hi henry

First of all, thank you for submitted analysis report.
But there are a lot of things missed I've requested.

And I reported this report initially, and will have to update below until 3JUL2020.

Please update the report.

1. No power
A. Find the root cause and screen factory stocks – PCBA and raw material
i. Report the factory screening result
ii. Report the rework STANDARD
B. Provide FXN rework standard
i. Provide factory rework history of 20k delivered on 26 March Lot. Including 2149688001202001050551.
 Update this actions.
2. No HDMI output
A. The cause should be included why not detected defect in the test process in factory
-> Please provide detail test log. The report show just factory manufacturing flow, can’t check test result.
(i.g screen capture image, test log.)
3. LED
A. IPQC keep sample check and audit daily in production line.
 Provide IPQC SOP before and after
4. Giftbox Damaged
A. IPQC keep sample check and audit daily in production line.
 Provide IPQC SOP before and after

5. “5. HDMI cable no output to TV”
6. “6. Ethernet cable NG”
 Please update due date of 8D report
7. Box folding NG
A. This section is missed. It was not counted as an official defect.
B. But, we have to provide the preventive action


Last one, FXN VN factory should be replaced with a regular product and return to ALT. Please let me know the schedule.
STB 2pcs
HDMI cable : 2pcs
Ethernet cable : 1pcs


Thanks
SON

(PM) Henry Chiou

2020-07-02 11:43

developer   ~0003719

Hi SH

Updated as attached.
The return schedule will be updated later.

Best,
Henry

(PM) Henry Chiou

2020-07-03 20:36

developer   ~0003728

Hi SH

We collected the report from the vendor and updated the report FYI.

(ALTech) SH Son

2020-07-24 14:51

developer   ~0003854

Hi Henry.

Thank you for updated till the vendor report.

2020. May inspection report will be close this version 0000834:0003728

Thanks
SON

(ALTech) SH Son

2020-07-24 14:52

developer   ~0003855

close it here.

Issue History

Date Modified Username Field Change
2020-04-24 10:26 (ALTech) SH Son New Issue
2020-06-05 16:32 (ALTech) SH Son Summary [BFX-AT100] 20k on 26 March Mass production inspection Report => [BFX-AT100] 2020 May Mass production inspection Report
2020-06-05 16:32 (ALTech) SH Son Due Date 2020-05-08 11:25 => 2020-06-26 11:25
2020-06-05 16:32 (ALTech) SH Son Description Updated
2020-06-05 16:33 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2020-06-05 16:33 (ALTech) SH Son Issue Monitored: (ALTech) SB Park
2020-06-05 16:33 (ALTech) SH Son Issue Monitored: (ALTech) SY Yoon
2020-06-05 16:33 (ALTech) SH Son Issue Monitored: (ALTech) BY Lee
2020-06-05 16:33 (ALTech) SH Son Issue Monitored: (ALTech) JW Kim
2020-06-05 16:34 (ALTech) SH Son File Added: [BFX-AT100] May_Mass production inspection_2020.06.02_V2.pdf
2020-06-05 16:34 (ALTech) SH Son Note Added: 0003653
2020-06-05 16:34 (ALTech) SH Son Assigned To => (PM) Henry Chiou
2020-06-05 16:34 (ALTech) SH Son Status new => assigned
2020-06-05 17:00 (PM) Henry Chiou Issue Monitored: (PM) Henry Chiou
2020-06-05 17:00 (PM) Henry Chiou Issue Monitored: (PM) Tiffanie Lai
2020-06-24 09:23 (PM) Henry Chiou File Added: Report for May production inspection_T99X171.00-V1.pptx
2020-06-24 09:23 (PM) Henry Chiou Note Added: 0003700
2020-06-29 16:47 (ALTech) SH Son Note Added: 0003709
2020-07-02 11:43 (PM) Henry Chiou File Added: Report for May production inspection_T99X171.00-V2.pptx
2020-07-02 11:43 (PM) Henry Chiou Note Added: 0003719
2020-07-03 20:36 (PM) Henry Chiou File Added: Report for May production inspection_T99X171.00-V3.pptx
2020-07-03 20:36 (PM) Henry Chiou Note Added: 0003728
2020-07-24 14:51 (ALTech) SH Son Note Added: 0003854
2020-07-24 14:52 (ALTech) SH Son Status assigned => closed
2020-07-24 14:52 (ALTech) SH Son Resolution open => fixed
2020-07-24 14:52 (ALTech) SH Son Note Added: 0003855
2023-02-23 10:18 (ALTech) SH Son Relationship added related to 0001662